The Pickerel Lake Conservancy and South End Association hired Clark Engineering to evaluate and provide possible solutions to improve water quality in the south end of Pickerel Lake. The focus areas of this study are the local roads along Webster Boulevard and the area upstream of the CR6 (Highway) culvert.

This report identifies short-term, intermediate, and long-term projects designed to improve the overall watershed management. A multi-level approach with practical options in the areas of road maintenance, intermediate projects, comprehensive planning, and zoning/building regulations are recommended. (See study)